When I get her built, this is where the smelter and the power house and bins will be located off the narrow gauge line at the base of the nolix coming down from the upper level of the layout. crushed ore comes in from the mines and gets reduced to bullion and then shipped out on the standard gauge.
No comments:
Post a Comment